Faimali

Español English

Location and structure

mapOur set-up in Patagonia Argentina

Faimali plant

The Faimali plant (Reg.No.2553) was totally refurbished in 2003 and is continually being improved to meet the most demanding health and quality requirements.

• Over 11.000 m2 of buildings & infraestructure.
• 800 ton cold-store built in 2006, for frozen boxes on racks, making a total of 1500 tons in the whole plant.
• A daily processing capacity of over 2500 lambs.
• Cold Store capacity for more than 1500 tons.
• Two new cutting rooms with a daily capacity of 25 tons.
• In 2008 we constructed a rendering plant to produce tallow and meat meal.

Patagonia Sur plant

Plant 2066 is now for cutting and for cold store services.





map2Geographical location


Our two lamb and hare processing plants are situated in Río Gallegos, in the south of Patagonia not too far from the Strait of Magellan.The coordinates are approximately 51°South and 69°West.




© 2011 - All rights reserved Frigorífico Faimali FJ Solutions, web design study, web agency, brand design, systems, php programming